HEATHER SWEATER CABLE EDITION 2409/13
3,50 €
Sandnes Garn 2409 single printed pattern
4 in stock
Spend 100€/$111 to qualify for Free Shipping!
Product details
Cast on sts for upper section of back, and work across according to diagram A. Cast off sts, then knit up sts on longest side of upper section. Work back according to diagram B until ribbing. Transfer sts to spare thread, knit up sts for left and right side front and work according to diagram C. Work turning rows back and forth to create and shape slanting shoulders, and inc sts for neck before the 2 front sides are joined to one. Work front back and forth until ribbing. Join back and front to same circular ndl and work ribbing in rnds. Sew side seams for back and front with mattress sts or hidden sts. Knit up sts for sleeves, and work sleeves in rnds with double moss-pattern, end with a long ribbing. Work neckband. Work garment with double yarn = 1 strand Tynn Peer Gynt + 1 strand Tynn Silk Mohair.